Design, supply and installation of a new berthing facility
Construction of 4.5 km of gravity quay wall - Piling works for cruise terminal & New marina including, associated marine furniture
The project comprises the construction of approximately 6km of hybrid gravity concrete block / rock revetment quay wall ...
The project comprises the design, manufacture and installation of a temporary breakwater at a CICPA facility on Arzanah Island ...
The project comprised the construction of a 170m gravity block quay wall with landing craft ramps, boat ramps as well as break water and rock revetment works ...
Design and Construction of approximately 12km of pedestrian boardwalk (6m wide) located on an existing breakwater on the outer...
EPC project comprising the construction of near shore marine works in the form of quayside and a vessel launching ramp as well as...
Construction of 3km of quayside to a depth of 10.5m parallel to the Deira Corniche, extending the usable hardstand...
Design and construction of 16.5 km long quay wall to create new islands, including soil improvement works
The project comprised the construction of a large temporary cofferdam to enable Taisei to construct the Palm Jumeirah Vehicular Tunnel in the dry...
Scope included the construction ship lift piers and bulkhead, quay wall and slope protection, dry berths, side transfer pit, construction hall ...