Island Harbour & Artificial Reefs – Al Mirfa



Owner Duration
Critical Infrastructure & Coastal Protection Authority 2016 - 2017

The project comprised the construction of a 170m gravity block quay wall with landing craft ramps, boat ramps as well as break water and rock revetment works. Back of quay works included road works, paving and utilities installations in the form of fire fighting and storm water services. Also part of the scope of works was the design and installation of pontoons to service a small craft marina.