Owner | Duration |
---|---|
Nakheel | 2014 - 2016 |
Design and Construction of approximately 12km of pedestrian boardwalk (6m wide) located on an existing breakwater on the outer crescent of Palm Jumeriah. The design brief also required the modification / re-construction of the existing rock armour revetment to comply with current design code requirements (1:50 year event). Also included in the original scope was the construction of two 100m long piers, housing restaurants and amenities.
Design, supply and installation of a new berthing facility
Construction of 4.5 km of gravity quay wall - Piling works for cruise terminal & New marina including, associated marine furniture
The project comprises the construction of approximately 6km of hybrid gravity concrete block / rock revetment quay wall ...