Owner | Duration |
---|---|
Critical Infrastructure & Coastal Protection Authority | 2016 - 2017 |
The project comprises the design, manufacture and installation of a temporary breakwater at a CICPA facility on Arzanah Island. The project also includes dredging works and a RORO Ramp. All works are being carried out in a high security area in accordance with strict Oil & Gas standards.
The initial design floated by the Client comprised a breakwater construction utilising geo-bags. We were able to offer an alternative piled wave dissipation solution that provided the Client with substantial cost and time savings.
Design, supply and installation of a new berthing facility
Construction of 4.5 km of gravity quay wall - Piling works for cruise terminal & New marina including, associated marine furniture
The project comprises the construction of approximately 6km of hybrid gravity concrete block / rock revetment quay wall ...