ARZANAH ISLAND - TEMPORARY BREAKWATER



Owner Duration
Critical Infrastructure & Coastal Protection Authority 2016 - 2017

The project comprises the design, manufacture and installation of a temporary breakwater at a CICPA facility on Arzanah Island. The project also includes dredging works and a RORO Ramp. All works are being carried out in a high security area in accordance with strict Oil & Gas standards.

The initial design floated by the Client comprised a breakwater construction utilising geo-bags. We were able to offer an alternative piled wave dissipation solution that provided the Client with substantial cost and time savings.