Owner | Duration |
---|---|
Tourism Development and Investment Company (TDIC) | 2008-2010 |
Permanent diversion of 1200m strech of the 150m wide Eastern Mangroves Channel, including sheetpile double cofferdams, dewatering, rock revetment, construction of quay wall and floating marina system
Design, engineering and marine construction of precast concrete platforms and walkways for Water Villas including
Construction of 300 m precast quay wall including rock foundation, precasting and installation of mass concrete blocks and construction of secant piles and sheet pile cut off wall
Construction of resort island 10 kms off the coast of Abu Dhabi including dredging, reclamation, rock revetment and breakwater and floating pontoons and tubular steel piling for marina system