Owner | Duration |
---|---|
Shamal Development (North 25) | 2019-Ongoing |
‘BAY MARINA
• Design & construction of 193 berth Marina for Vessels from 14m to 160m, approx area of 15,374m2,
• Pontoon furniture for vessel berthing and mooring, way finding (signage), waste collection,
• Tubular Piles of diameter varying from 559 to 914 mm of depth 21 m – 283 no,
• Access gangways to pontoons including connections to the existing quay walls,
• MEP services: potable water, sewerage pump out, electrical layout, telecom network up to gangway.
PIER EXTENSIONS
• 167m long pier comprising reinforced concrete deck and tubular steel piles.
• 3no pile decks for substation buildings for Bay and Harbour Marinas
Construction of 300 m precast quay wall including rock foundation, precasting and installation of mass concrete blocks and construction of secant piles and sheet pile cut off wall
Permanent diversion of 1200m strech of the 150m wide Eastern Mangroves Channel
Construction of resort island 10 kms off the coast of Abu Dhabi including dredging, reclamation, rock revetment and breakwater and floating pontoons and tubular steel piling for marina system