Owner | Duration |
---|---|
H.H. Sheikh Ahmed Bin Saeed Al Maktoum | 2010-2010 |
Design and construction of Marina Restaurant:
Design, supply and driving of steel tubular piles
Fabricate structural steel substructure and superstructure inclusive corrosion Protection.
Design, supply, install precast slabs and related concrete works
Supply and install superstructure and related concrete works
Construction of 300 m precast quay wall including rock foundation, precasting and installation of mass concrete blocks and construction of secant piles and sheet pile cut off wall
Permanent diversion of 1200m strech of the 150m wide Eastern Mangroves Channel
Construction of resort island 10 kms off the coast of Abu Dhabi including dredging, reclamation, rock revetment and breakwater and floating pontoons and tubular steel piling for marina system