Owner | Duration |
---|---|
H.H. Sheikh Ahmed Bin Saeed Al Maktoum | 2010-2010 |
Design and construction of Marina Restaurant:
Design, supply and driving of steel tubular piles
Fabricate structural steel substructure and superstructure inclusive corrosion Protection.
Design, supply, install precast slabs and related concrete works
Supply and install superstructure and related concrete works
Construction of resort island 10 kms off the coast of Abu Dhabi including dredging, reclamation, rock revetment and breakwater and floating pontoons and tubular steel piling for marina system
Design & construction of berth Marina for Vessels from 14m to 160m, approx area of 15,374m2,
Construction of various piers, viewing platforms and floating berth for Yas Island Resort