Owner | Duration |
---|---|
First Gulf Bank | 2006-2008 |
Construction of resort island 10 kms off the coast of Abu Dhabi including dredging, reclamation, rock revetment and breakwater and floating pontoons and tubular steel piling for marina system
Design & construction of berth Marina for Vessels from 14m to 160m, approx area of 15,374m2,
Construction of various piers, viewing platforms and floating berth for Yas Island Resort
Design and construction of Marina Restaurant:
Design, supply, install precast slabs and related concrete works