Our work

RUWAIS REFINERY EXPANSION



Owner Duration
Takreer 2010-2011

Design, engineering and construction of 4 number 3.0 m diameter submarine sea water intake pipelines including dredging, stringing, sub-sea installation and backfilling. Approximately 16km of intake pipelines was installed utilising float and sink methodology.