Owner | Duration |
---|---|
Takreer | 2010-2011 |
Design, engineering and construction of 4 number 3.0 m diameter submarine sea water intake pipelines including dredging, stringing, sub-sea installation and backfilling. Approximately 16km of intake pipelines was installed utilising float and sink methodology.
'EPC for Intake/Outfall system consisting of:
Ø2.7m x 2 x 450m Intake Pipeline (GRP) with intake head And Ø2.7m x 2 x 900m Outfall Pipeline with diffusers
Sea Water Intake Head & Structure comprise following
•Two number of HDPE Intake pipe of 1200 mm diameter
Design, Construction, Commissioning of the outfall lines for Dubai Creek Harbor Outfall:
• Supply & Installation of 2 no's parallel Outfall Pipelines of approximate OD1.2 meter,