Our work



Owner Duration
Sharjah Electricity and Water Authority (SEWA) 2019-Ongoing

‘EPC for intake/outfall system consisting of:
• Ø2.7m x 2 x 450m Intake Pipeline (GRP) with intake head & Ø2.7m x 2 x 900m Outfall Pipeline with diffusers
• Onshore Intake Pumping Station, Onshore Outfall Seal Pit, Maker Bouys and Oil Booms
• Storm Water Outfall Structure,
• Re-alignment of existing rock Revetment (Corelocs) & Breakwater installation for Pipeline Installation
• Construction of Precast / cast in situ culvert at the foot print of revetment
• Temporary cofferdam at offshore location for culvert construction.
• Dredging trench for Intake and Outfall pipes