Owner | Duration |
---|---|
Sharjah Electricity and Water Authority (SEWA) | 2019-Ongoing |
‘EPC for intake/outfall system consisting of:
• Ø2.7m x 2 x 450m Intake Pipeline (GRP) with intake head & Ø2.7m x 2 x 900m Outfall Pipeline with diffusers
• Onshore Intake Pumping Station, Onshore Outfall Seal Pit, Maker Bouys and Oil Booms
• Storm Water Outfall Structure,
• Re-alignment of existing rock Revetment (Corelocs) & Breakwater installation for Pipeline Installation
• Construction of Precast / cast in situ culvert at the foot print of revetment
• Temporary cofferdam at offshore location for culvert construction.
• Dredging trench for Intake and Outfall pipes
Sea Water Intake Head & Structure comprise following
•Two number of HDPE Intake pipe of 1200 mm diameter
Design, Construction, Commissioning of the outfall lines for Dubai Creek Harbor Outfall:
• Supply & Installation of 2 no's parallel Outfall Pipelines of approximate OD1.2 meter,
Design, engineering and construction of 4 number 3.0 m diameter submarine sea water intake pipelines including dredging, stringing...