| Owner | Duration |
|---|---|
| Asteco Development Management | 2005-2005 |
Design, engineering and marine construction of precast concrete platforms and walkways for Water Villas including
– Supply and installation of tubular piles,
– Precast concrete platforms and precast concrete walkways and concrete and steel structure of villas.
Design and construction of Marina Restaurant:
Design, supply, install precast slabs and related concrete works
Construction of 300 m precast quay wall including rock foundation, precasting and installation of mass concrete blocks and construction of secant piles and sheet pile cut off wall
Permanent diversion of 1200m strech of the 150m wide Eastern Mangroves Channel