GRC DEVELOPMENT PROJECT



Owner Duration
Gulf Refining Company 2011-2012

Topside tanker berth facilities including lines to the IOC terminal, EMOIL Terminal as well as a new line connecting the IOC Terminal and the Star Energy Oil Tanking (SEOT) Terminal to Berthing Facility. Topside services installations also included product loading arms, E&I and fire fighting systems.

Marine works included the Construction of a new 400 m long, 18 m deep Tanker Berth using pre-cast gravity blocks as well as two sizable mooring dolphins and rock revetment works.