Owner | Duration |
---|---|
Dubai Civil Aviation Authority | 2004-2006 |
Construction of 4 Fuel Storage Tanks of total capacity 50,000m3 including Fuel hydrant Pumps and Pipeline, De-fuelled Product Tanks, Slopes Tanks for Fuel Drainage System with associated Piping, Hydrant pumping stations, Civil, Electrical & instrumentation work as well as the installation of Fire Fighting Equipment.
Scope includes Supply, Installation, Hydro-testing, Flushing and Commissioning of a Jet Fuel Hydrant Piping System of approximately 2km long ...
Scope includes Supply, Installation, testing and commissioning of Firefighting systems as well as the construction of new Fire Water Storage Tanks, Fire/Foam Systems, F & G Detection and Alarm System...
Extension of EMDAD Jet fuel pipeline from Berth 5 to Berth 7 and associated works...