| Owner | Duration |
|---|---|
| Empower | 2007 - 2009 |
Supply, installation, testing and commissioning of a 26km District Cooling Distribution Network including valve chambers at the site of the City of Arabia, Dubai
Construction of CHW Network of approx. 4.6 Km to serve chilled water to the plots at DHCC to Jadaf DHCC II- Phase 2 with Tie in Connections
Construction of Chiller water pipe network of length 5.6 Km to deliver chilled water from the existing Semi-Permanent Plant in Dubiotech
Trench Excavation, Supply & Laying of Pre-insulated pipes including fittings, backfilling of trench & testing and commissioning