Our work



Owner Duration
EMPOWER 2018-2019

Construction of Chiller water pipe network of length 5.6 Km  with Tie in to the existing pipe network to deliver chilled water from the existing Semi-Permanent Plant in Dubiotech Development to a different plot, and associated works including removal and disposal of road material over trenches ,Excavation, backfilling & reinstatement of trenches