Owner | Duration |
---|---|
Highness the Ruler of Dubai | 1974-1975 |
Construction of a draw-bridge across an existing boat channel, approximately 29 meters in length including the construction of the approach embankment and road.
Complex R.C. and Steel Structure with Associated Mechanical Works.
Construction of 160m L x 12m W (32m Long - 5 Span) Bridge,
Design, engineering and construction of bridge with 60 m span.