Owner | Duration |
---|---|
Public Works Dept. | 1999-2000 |
Design, engineering and construction of bridge with 60 m span. The works included bored in situ piles in marine conditions, pile heads, piers, pier heads and precast prestressed deck structure with associated abutments and shore protection.
Complex R.C. and Steel Structure with Associated Mechanical Works.
Construction of 160m L x 12m W (32m Long - 5 Span) Bridge,
Design, engineering and construction of two bridges with 70 m span