| Owner | Duration |
|---|---|
| Highness the Ruler of Dubai | 1974-1975 |
Construction of a draw-bridge across an existing boat channel, approximately 29 meters in length including the construction of the approach embankment and road.
Construction of 160m L x 12m W (32m Long - 5 Span) Bridge,
Design, engineering and construction of bridge with 60 m span.
Design, engineering and construction of two bridges with 70 m span