Owner | Duration |
---|---|
Public Works Dept. | 1999-2000 |
Design, engineering and construction of bridge with 60 m span. The works included bored in situ piles in marine conditions, pile heads, piers, pier heads and precast prestressed deck structure with associated abutments and shore protection.
Construction of 160m L x 12m W (32m Long - 5 Span) Bridge,
Design, engineering and construction of two bridges with 70 m span
Complex R.C. and Steel Structure with Associated Mechanical Works.