| Owner | Duration |
|---|---|
| EMPOWER | 2018-2019 |
Construction of Chiller water pipe network of length 5.6 Km with Tie in to the existing pipe network to deliver chilled water from the existing Semi-Permanent Plant in Dubiotech Development to a different plot, and associated works including removal and disposal of road material over trenches ,Excavation, backfilling & reinstatement of trenches
Construction of CHW Network of approx. 4.6 Km to serve chilled water to the plots at DHCC to Jadaf DHCC II- Phase 2 with Tie in Connections
Trench Excavation, Supply & Laying of Pre-insulated pipes including fittings, backfilling of trench & testing and commissioning
Construction of Chilled Water Piping Network expansion of approx. 5 Km plotted into four sections for two phases at DLRC and IMPZ including Tie in and Civil Works