Implementation of HSE Risk Assessment works at Various Depots & Terminals



Owner Duration
ADNOC Distribution 2016 - 2018

The Project comprises the upgrade of various depots is divided into three packages:

PACKAGE A –Ras-Al-Khaimah Depot

PACKAGE B- Abu Dhabi International Airport & Musaffah Depot

PACKAGE – Al Ain International Airport


New Firewater Storage Tank (8000 CuM) + Associated Facilities

Foam Stations – Pump House/Foam Tank/Foam pumps – Duty, Standby & Jockey, Piping, etc. with facilities.

New Foam Network Piping (Replace existing) – Entire Depot.

New Fire Water Network Piping (Replace  existing) – Entre Depot

Replace + Install FW Spray Cooling System + Foam System Piping for exist. fuel storage tanks (13 Tanks – Tank No. 4A/4B/5A/5B/1A/1B/6A/6B/2A/2B/2C & 3 Tanks – Tank No. 1C/2D/2E only bottom connection) + Deluge Skids (Water Deluge Skids 15 Nos & Foam Deluge Skids 21 Nos)

Fixed /Rim Seal foam injection system + Cathodic protection system

Foam Cooling System for Loading Bays 1 to 10 + prod. Pump House

Wet sprinkler system FW Pump House + Hose Reel system for  Vehicle Workshop & Vehicle Wash facility

Tie-in for IRP-2 + LPG + VRU + Misc. facilities

Gas System for Substation & Control Rooms; F&G for Tank farm, product pump house and loading bays +Electrical Tie-in .

New Control Panel and its integration with existing F&G PLC

Demolition of the existing fire fighting system after commissioning of new system + Miscellaneous works