EMOIL PROJECT



Owner Duration
EMOIL Petroleum Storage FZCO 2014 - 2015

Project includes the supply and installation of Tank Stripping pumps, replacement of internal piping to three tanks and the installation of a new 16” pipe network to service the new stripping pumps, including Electrical & Instrumentation as well as Fire fighting works.