Our work

DUBAI HARBOUR MASTER PLAN BAY MARINA , ZONE 4B BAY MARINA PIER EXTENSION , 4D HARBOUR MARINA PIER EXTENSIONS



Bay Marina project comprises design, construction, installation, testing, commissioning and remedying of defects.

Harbour Marina project comprises design and construction of a berthing system and associated services /Utilities.

Key elements of the works that AST will deliver include

  • Detailed Design and construction of One (1 Nr.) Marina for Vessels from 14m to 160m
  • No of vessels to be berthed- 193
  • Approximate area for concrete Pontoon – 15,374 m2
  • Design, supply and Installation of piled pontoon restraint system to accommodate pontoon berthing structures. No of piles of diameter varying from 559 to 914 mm of depth 21 m – 283 no.
  • Pontoon structures for vessel berthing and mooring.
  • Pontoon furniture including all required furniture for vessel berthing and mooring, way finding (signage), waste collection.
  • Gangways for access to pontoons including connections to the existing quay walls.
  • MEP services potable water, sewerage pump out, electrical layout, telecom network up to gangway.
  • A 167m long pier comprising reinforced concrete deck and tubular steel piles.
  • Pier extension
  • 3no pile decks for substation buildings and other buildings

Overseas AST is proud to be part of the team to deliver high-end waterfront Development which will be the biggest in the Middle East and North Africa with the capacity to host yachts up to 160m in length.