Our work




Island Harbour & Artificial Reefs – Al Mirfa

The project comprised the construction of a 170m gravity block quay wall with landing craft ramps, boat ramps as well as break water and rock revetment works ...

Learn More
Our work

Blue Water island District Cooling Network

Scope includes Construction, testing and commissioning of a 3Km chilled water supply and return network at Blue Water Island including Hot tapping works, micro tunnelling, valve chambers, draw pits and Tie-ins at ETS rooms...

Learn More




Jet fuel system and Emergency Fuel Shut off (EFSO) and Leak detection system

Scope includes Supply, Installation, Hydro-testing, Flushing and Commissioning of a Jet Fuel Hydrant Piping System of approximately 2km long ...

Learn More
Our work

Dubai Creek Harbour Development - Marine Works Phase 1

The project comprises the construction of approximately 6km of hybrid gravity concrete block / rock revetment quay wall ...

Learn More




ARZANAH ISLAND - TEMPORARY BREAKWATER

The project comprises the design, manufacture and installation of a temporary breakwater at a CICPA facility on Arzanah Island ...

Learn More
Our work

The Centrepiece - Floating Pontoons

Design and installation of pre-cast pontoons and sinker blocks, including the fabrication and installation of aluminium decking, steel super structure and cladding ...

Learn More




Implementation of HSE Risk Assessment works at Various Depots & Terminals

Scope includes Supply, Installation, testing and commissioning of Firefighting systems as well as the construction of new Fire Water Storage Tanks, Fire/Foam Systems, F & G Detection and Alarm System...

Learn More
Our work

PRECAST CONCRETE AND STEEL FABRICATION

Our structural steel fabrication and pre-cast concrete facilities in Dubai & Abu Dhabi provide us with the opportunity to support specialized elements of our service offering, in house...

Learn More




EMOIL PROJECT

Project includes the supply and installation of Tank Stripping pumps, replacement of internal piping to three tanks and the installation of a new 16” pipe network ...

Learn More
Our work

DESIGN AND BUILD OF THE BOARDWALK AND PIER AT PALM JUMEIRAH

Design and Construction of approximately 12km of pedestrian boardwalk (6m wide) located on an existing breakwater on the outer...

Learn More




EMPOWER - JUMEIRAH BEACH PROJECTS

Supply, installation, testing and commissioning and road reinstatement works for three district cooling networks including very deep valve chambers...

Learn More
Our work

SATAH AL RAZBOOT (SARB) FIELD DEVELOPMENT

EPC project comprising the construction of near shore marine works in the form of quayside and a vessel launching ramp as well as...

Learn More




DEIRA DHOW WHARFAGE

Construction of 3km of quayside to a depth of 10.5m parallel to the Deira Corniche, extending the usable hardstand...

Learn More
Our work

EMDAD AVIATION FUEL LINES

Extension of EMDAD Jet fuel pipeline from Berth 5 to Berth 7 and associated works...

Learn More




AIRFIELD WORKS - SP 100 - FUEL LINE WORKS

Supply, installation, hydro testing, flushing and commissioning of a Jet Fuel Line Hydrant Piping System approximately 2km in length...

Learn More
Our work

HODARIYAT BRIDGE

Design and construction of a 1.3 km long Bridge joining the UAE Capital with Hodariyat island including a 400m long cable stayed

Learn More




GRC DEVELOPMENT PROJECT

Topside tanker berth facilities including lines to the IOC terminal, EMOIL Terminal as well as a new line connecting the IOC Terminal...

Learn More
Our work

BOROUGE 3 - OFFSITE & UTILITIY

Design, engineering and construction of 4 number 3.0 m diameter submarine sea water intake pipelines including dredging, stringing...

Learn More




RUWAIS REFINERY EXPANSION

Design, engineering and construction of 4 number 3.0 m diameter submarine sea water intake pipelines including dredging, stringing...

Learn More
Our work

TABREED DISTRICT COOLING SCHEME - DUBAI METRO

Supply, installation, testing and commissioning of a 9km district cooling network including valve chambers and associated facilities..

Learn More




Jebel Ali International Airport City - Phase 1A Airfield and Infrastructure

Supply, installation, testing and commissioning of a jet fuel hydrant system approximately 18km in length, including valves, reinforced...

Learn More
Our work

AL RAHA BEACH DEVELOPMENT

Design and construction of 16.5 km long quay wall to create new islands, including soil improvement works

Learn More




CITY OF ARABIA DISTRICT COOLING DISTRIBUTION PIPE NETWORK

Supply, installation, testing and commissioning of a 26km District Cooling Distribution Network including valve chambers at the site...

Learn More
Our work

DUBAI HEALTH CARE CITY DISTRICT COOLING PIPELINE NETWORK

Supply, installation, testing and commissioning and road reinstatement works for a chilled water network approximately 9 Km...

Learn More




FUEL FARM EXPANSION, DUBAI INTERNATIONAL AIRPORT

Construction of 4 Fuel Storage Tanks of total capacity 50,000m3 including Fuel hydrant Pumps and Pipeline, De-fuelled Product...

Learn More
Our work

JEBEL ALI 'L' STATION - OFFSHORE WORKS

Construction of offshore seawater intake structure comprising...

Learn More




THE PALM JUMEIRAH VEHICULAR TUNNEL

The project comprised the construction of a large temporary cofferdam to enable Taisei to construct the Palm Jumeirah Vehicular Tunnel in the dry...

Learn More
Our work

ABU DHABI SHIP BUILDING SITE MAINTENANCE AND CONSTRUCTION

Scope included the construction ship lift piers and bulkhead, quay wall and slope protection, dry berths, side transfer pit, construction hall ...

Learn More




AL MAKTOUM SECOND BRIDGE OPENING SPAN

Construction of a draw-bridge across an existing boat channel, approximately 29 meters in length including the construction of the...

Learn More
Our work